Optimization of spare parts configuration scheme for ship equipment based on multi-agent simulation
Year: 2024
Type: conference-paper
DOI: 10.1117/12.3052187
Authors: wei li, Hongjun Li, Li Hua
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4405294288
