Correction to “Development of intelligent traction walking plate for tension overhead construction”
Year: 2024
Type: erratum
Abstract: Xiaobin Li, Ye Li, Feng Wang, Zhiming Huang, Pan Yao, Baoguo Li. Development of intelligent traction walking plate for tension overhead construction. The Journal of Engineering. 2024, 2024(7). Due to our mistake in writing the paper, we wrote the wrong application time and place in the sixth part of the engineering application in the original paper. Therefore, we would like to change the sentence ‘At the same time, the developed intelligent traction plate was applied on October 11, 2020, in the Shandong Heze Yongfeng 220 kV transmission line project, the engineering application situation is shown in Figure 15,’ to ‘At the same time, the developed intelligent traction plate was applied on 11 October 2023 in a 220 kV transmission line project in China; the engineering application situation is shown in Figure 15.’ We apologize for this error.
Source: The Journal of Engineering
DOI: 10.1049/tje2.70041
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $950
OpenAlex ID: W4405454434
