Assessment of wind power plant performance using turbine performance and power curves: a case study of PLTB TOLO I Jeneponto
Year: 2024
Type: article
Abstract: Jeneponto Regency in South Sulawesi possesses significant wind potential, making it an ideal location for the development of Wind Power Plants (WPP). However, these WPPs are intermittent due to the inconsistent nature of wind energy, presenting challenges that affect the performance and efficiency of turbines in generating electricity. Therefore, this study aims to evaluate the performance of the SWT-3.6-130 wind turbines at the Tolo 1 WPP in Jeneponto to determine their capability in converting wind energy into electrical energy at specific wind speeds. The evaluation results indicate that the performance of the SWT-3.6-130 wind turbines at the Tolo WPP in February 2022 was not optimal. The maximum output power generated by these turbines approached the maximum capacity of 3.6 MW, with Turbine 06 producing 3.57 MW at a wind speed of 13.07 m/s, Turbine 09 producing 3.57 MW at a wind speed of 12.27 m/s, and Turbine 013 producing 3.58 MW at a wind speed of 12.11 m/s. Although the power generated was close to the maximum capacity, the performance variation among turbines indicates the need for further evaluation to address factors reducing efficiency. Power coefficient analysis shows that Turbine T13 exhibited the best performance, with the fewest instances of power coefficient values not meeting standards. This study provides crucial insights for improving performance and preventing failures at the Tolo WPP in the future.
Source: Jurnal Teknologi Elekterika
Authors: Sofyan, Ahmad Rosyid Idris, Muh. Ardiansyah Latif, Sarma Thaha, Andarini Asri, Muhammad Thahir, Sitti Wetenriajeng Sidehabi
Institutions: Politeknik Negeri Ujung Pandang, Politeknik ATI Makassar
Language: English
Subfield: Aerospace Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4405693377
