Fixed start method for repetitive project scheduling with simulated annealing

Year: 2025
Type: article
Abstract: This research deals with the high project completion variability by presenting a new method to decrease such variability in repetitive construction projects. To achieve this, a Fixed Start Method (FSM) -where the starts of each activity with a high level of probabilistic confidence for the planned project duration are fixed- was applied, where the high level of probabilistic confidence obtained was optimized with the use of the metaheuristic algorithm called Simulated Annealing (SA). This procedure evaluated the project completion in a case study based on the coefficient of variance (COV) of the resulting standard deviation, mean, and temperature selected for the SA. Thus, the combined FSM and SA (FSSA) is a new method that decreases the variability of scheduling duration while achieving project completion times. Finally, the proposed FSSA method for construction scheduling was validated in a case study using Discrete Event Simulation.
Source: Heliyon
Language: English
Open Access status: gold
Estimated APC paid: $2,270
OpenAlex ID: W4406142396
FWCI: 4.736
Cites: 90
Cited by: 6
Related to: 10