Work

Leveraging PMU for Protection and Control

Year: 2024
Type: conference-paper
Abstract: Key Project Objectives▪ Investigate system fault signatures as a function of the IBR penetration level as well as the interactions between system protection and IBR protection.▪ Assess the impact of high IBR penetration on transmission protection systems and communicate effective IBR study tools and operational impacts to utilities' engineering support and operations groups.▪ Develop and demonstrate new and practical protection schemes that enable safe and reliable grid operation with up to 100% IBR generation.
Authors: Zheyuan Cheng, David Hart
Language: English
Open Access status: gold
OpenAlex ID: W4406569630
FWCI:
Cites:
Cited by:
Related to: 10