Year: 2024
Type: article
Abstract: Lemah Abang Station is a station located in Cikarang, this station is used for Cikarang-Cikampek, Cikarang-Purwakarta trips and KRL trips. To support the general national energy plan (RUEN) through Presidential Regulation No.79 of 2014, the Government of Indonesia has set a policy of increasing the share of renewable energy in the national energy mix to 23% by 2025. To support this effort, PLN's electrical power is converted to solar panels. This can be seen from the abundant solar energy potential in Cikarang, namely 5,040 Kwh/m2/day with a total duration of 2-9 hours of solar radiation per day. The solar panels that will be made have a capacity of 20 kWp using 48 units of 450Wp solar panels. Other components needed are a 20 kW inverter, 8 12V 200Ah batteries, kWh Exim, Solar Charger. Based on the economic analysis, the cheapest energy cost is 1762/kWh. In addition, the investment analysis for the construction of solar panels with the NPV, IRR, PI, and DPP methods is declared feasible to be carried out.
Source: SAINSTECH NUSANTARA
Authors: Natriya Faisal Rachman, Cahya Firdhous
Language: English
Subfield: Environmental Engineering
Field: Environmental Science
Domain: Physical Sciences
Open Access status: hybrid
OpenAlex ID: W4407828503
