Year: 2025
Type: article
Abstract: In this paper a probabilistic inventory model with deterministic and stochastic environments is discussed.We analyze the model by geometric programming and fuzzy geometric programming techniques.During the entire discussion the model is discussed under Uniform and exponential lead time demands.Finally it is concluded that fuzzy geometric programming gives us more optimized result than geometric Programming Technique.
Source: IARJSET
Author: Soumen Banerjee
Institution: Raja Peary Mohan College
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4407850740
