Year: 2025
Type: article
Abstract: The success of a project is primarily measured by its ability to be completed on time and within budget while maintaining the best quality. Therefore, time or project duration is a crucial constraint in construction project management, such as sidewalk construction projects. The purpose of this research is to identify risk variables, risks analysis, and plan risk mitigation that occur during the implementation phase of the sidewalk construction project in DKI Jakarta, which result in time delays. Data collection in this study used interview and questionnaire survey methods, while data analysis employed the Risk Probability and Impact Assessment and Probability and Impact Matrix methods. The results of this study yielded a risk mitigation plan for 2 (two) dominant risk variables that caused delays in the sidewalk construction project in DKI Jakarta, namely the utility relocation and the undetected existing utility system
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: bronze
OpenAlex ID: W4407998586
