Modeling And Cost Planning For The Tanjungpandan District Court Building Project Using Building Information Modeling (BIM) Method
Year: 2025
Type: article
Abstract: Infrastructure development in Indonesia is currently in a fairly massive development phase. To support this, the government of the Republic of Indonesia improves the quality of national development by continuing to adapt to existing technological developments, one of which is Building Information Modeling (BIM). In this case, the use of BIM in planning and designing a construction object becomes easier because it can be done simultaneously. In addition, the design produced through the BIM method also contains data and information that can be used in other phases of construction. One of the data produced is the quantity of materials that can be used to estimate construction costs. In this study, the use of the BIM method is intended to determine the comparison of the costs generated to the cost of conventional methods of the project. The results of the cost calculation obtained by the BIM method are cumulatively -2,06% lower than the conventional method. There is a varying cost deviation for each work item, with the smallest cost deviation being +0,48% for beam structure work and the largest cost deviation being +126,26% for stair work.
Source: Jurnal Teknologi Terapan G-Tech
Institution: Sumatera Institute of Technology
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $19
OpenAlex ID: W4409176758