Year: 2025
Type: article
Abstract: Extra loads connected to backup sources should be removed from hospitals and industries. Shedding is unavoidable since overloading could happen if the additional loads are not taken into account. The goal of this project is to create a PLC-based automatic shedding system that will activate when the main generator trips and we need to cut off non-essential. An energy meter will be used to determine the power consumption. This prepaid energy meter is smart. Prior to using the electricity, you will recharge it. It will send a message to your mobile device to inform you of the number of units consumed. PLC (Programmable Logic Controller), Microgrid Systems, Power System Stability, Energy Monitoring, Integration of Renewable Energy.
DOI: 10.55041/ijsrem44516
Authors: Avinash Suryavanshi, Swapnil Pharande
Institution: Savitribai Phule Pune University
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: bronze
OpenAlex ID: W4409428704
