Work

Transferring Pressure Mechanism Across Gob-Side Roadway Goaf with Coal Pillar During Distant Face Mining: A Case Study

Year: 2025
Type: article
Abstract: The gob-side roadway technique is extensively utilized in coal extraction due to its capacity to enhance coal resource recovery efficiency and mitigate mining sequence conflicts. Nevertheless, increasing mining depths lead to progressively intricate stress conditions, posing challenges for maintaining gob-adjacent roadway surrounding rock stability. Taking the belt haulage roadway 1513 (BHR 1513) at Xinyi Coal Mine as an engineering case, this research investigates the application of narrow-pillar gob-side roadway construction under remote working face mining conditions. By integrating field observations, analytical modeling, and computational simulations, the cross-goaf pressure transfer phenomenon and its formation mechanism in narrow-pillar roadways under distant mining operations are systematically examined. Key findings reveal that during the alternating extraction of wide and narrow working faces, the caving angle terminates roof collapse within the narrow working face goaf at the second key stratum (KS2). The subsequent mining of the adjacent wide working face induces stress accumulation in the overlying “T”-shaped strata zone, triggering the instability of the inter-working face island pillar. This pillar failure merges the two goafs into an expanded void, initiating sequential fracture, collapse, and rotational displacement across all overlying key strata (KS). Consequently, previously intact KS above the narrow working face goaf undergo fracturing and rotation, amplifying lateral main roof block subsidence toward the goaf. This kinematic process generates substantial deformation in the narrow-pillar gob-side roadway.
Language: English
Open Access status: gold
Estimated APC paid: $2,896
OpenAlex ID: W4409433897
FWCI: 0.323
Cites: 14
Cited by: 1
Related to: 10