Year: 2025
Type: article
Abstract: This paper deals with the design and control of an enhanced grid-tied photovoltaic (PV) cascaded H-Bridge (CHB) inverter, which suffers from issues related to operation in the overmodulation region in the case of a deep mismatch configuration of PV generators (PVGs). This can lead to reduced system performance in terms of maximum power point tracking (MPPT) efficiency, or even instability (i.e., a lack of control action). The proposed solution is to insert into the cascade a power cell fed by a battery energy storage system (BESS) with the aim of providing an additional power contribution. The latter is useful to reduce the modulation index of the cell, delivering more power than the others when a preset threshold is crossed. Moreover, a suitable hybrid modulation method is used to achieve the desired result. A simulated performance in a PLECS environment proves the viability of the proposed solution and the effectiveness of the adopted control strategy.
Source: Energies
DOI: 10.3390/en18082056
Institution: University of Naples Federico II
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $3,137
Funder: European Commission
Awards: G1175062043, G2649423451
OpenAlex ID: W4409552381
