Stability reassessment and optimization of construction procedure for left bank dam shoulder slope
Year: 2025
Type: conference-paper
DOI: 10.1117/12.3062510
Authors: Yongjin Cheng, Wei Li, Guiyan Gong, Ming Jiang, Xingtian Yan
Institution: Powerchina Huadong Engineering Corporation (China)
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4409784724
