APLIKASI VALUE ENGINEERING PADA PEKERJAAN TAMBAH KURANG UNTUK MENINGKATKAN EFISIENSI BIAYA KONTRAKTOR (Studi Kasus: Gedung D BPOM Jakarta)
Year: 2024
Type: article
Abstract: Cost planning is one of the important things in a development project, both for theproject owner and the implementing contractor. The contractor has a planned costtarget at the tender stage, however, changes in costs may occur during theimplementation period due to additional or less work and resulting in changes incosts. To be able to achieve the cost efficiency target, this can be done by carryingout value engineering. The stages of the value engineering method consist of theinformation stage, function analysis stage, creativity stage, evaluation stage,development stage and recommendation stage. The application of value engineeringin the BPOM Building D Construction Project can provide an increase cost and stillmaintain function. Contractor get cost efficiency of IDR 1,528,657,929,- or 2.52%,while the project owner gets a cost efficiency of IDR 1,182,279,319 or 1.66%.
Authors: Indra Hidayat, Kartono Wibowo, Sumirin Sumirin
Institution: Sultan Agung Islamic University
Language: English
Subfield: Strategy and Management
Domain: Social Sciences
Open Access status: diamond
OpenAlex ID: W4409837628
FWCI:
Cites:
Cited by:
Related to: