Construction Planning With Mathematical Optimization (part 3): Scheduling of Continuous and Repetitive Work Method for Interior Finish Works

Year: 2025
Type: article
Abstract: Continuous and Repetitive Work Method in high-rise building construction is essential for the stable employment of workers and the enforcement of learning effectiveness. The scheduling for this method, however, is very difficult to achieve an adequate work process for low-rise building construction which has not enough repetitive works. The author expanded the conventional method, and proposed a new approach for the scheduling using mathematical optimization, then applied the method in low-rise building construction.
Author: Naruo KANO
Institution: Waseda University