Year: 2025
Type: conference-paper
Abstract: The research article is devoted to the problem of automating the estimation of cost and labor in the road construction process, given the complexity of influencing factors such as soil type, weather conditions and resource costs. The article discusses the importance of accurately determining these parameters in the context of road design, emphasizing the high qualification of engineers. Particular attention is paid to the importance of automating preliminary assessment, identifying its key benefits: data analysis, rapid generation of estimates, decision optimization and risk management. As a result, automated systems are becoming an integral part of successful completion of road projects, minimizing financial and time costs. The paper further focuses on the description of the developed software solution aimed at automating the preliminary determination of embankment design, geomaterial strength characteristics, resources and construction cost in road construction projects.
Institutions: University of Tyumen, Gazprom (Russia)
Language: English
Subfield: Civil and Structural Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
OpenAlex ID: W4410316705
