Work

Replication and sequencing of unreliable jobs on m parallel machines: New results

Year: 2025
Type: article
Abstract: This paper gives new results for the problem of sequencing m copies of n unreliable jobs (i.e., jobs that have a certain probability of being successfully carried out) on m parallel machines (one copy per machine). A job is carried out if at least one of its copies is successfully completed, in which case a certain revenue is earned. If the copy of a job fails, the corresponding machine is blocked and cannot perform the subsequently scheduled job copies. The problem is to sequence the n copies of each job on each of the m machines in order to maximize the expected revenue. For the case of m = 2 , Agnetis et al. (2022) proposed a metaheuristic approach and some upper bounding schemes. Here we address the general m -machine problem, giving a simple ( 1 − 1 / e ) -approximation algorithm, an even simpler algorithm, for which we show a tight logarithmic approximation guarantee, and an additional heuristic as well as an additional metaheuristic. We provide computational results, which, along with a new upper-bounding scheme, establish the effectiveness of our approaches in practice.
Language: English
Open Access status: hybrid
Estimated APC paid: $3,570
OpenAlex ID: W4410539783
FWCI: 0.519
Cites: 17
Cited by: 1
Related to: 10