Evaluation of construction impacts and optimization of control measures for large-section metro tunnels overpassing existing tunnels
Year: 2025
Type: article
Abstract: The development of urban rail transit has led to an increase in the number of large section subway tunnels crossing existing tunnels. This study combines the actual engineering of the Yanggongqiao Station Longzhuayan Station section tunnel of Chengdu Metro Line 17 Phase II project crossing the existing Line 7 shield tunnel, and uses on-site investigation, monitoring, and numerical simulation methods to evaluate the construction impact. Based on this, measures such as bench pile reinforcement, pre grouting, and parameter optimization are proposed. In practical applications, the comparison between monitoring and simulation results shows that these measures effectively control the deformation of existing tunnels, providing important references for similar projects.
Source: Thermal Science
DOI: 10.2298/tsci2502417c
Authors: Yi-Ming Chen, Shuang You, Wei-Chen Liao, Jun-Da Wang, Hai-Chun Hao, Zhou Yu
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $161
Awards: G2030755549, G3495423773
OpenAlex ID: W4410824045
