Work

A Study on the Optimal Configuration of Offshore Substation Transformers

Year: 2025
Type: article
Abstract: The growing scale of offshore wind farms and increasing transmission distances has driven the demand for optimized offshore substation (OSS) configurations. This study proposes a comprehensive techno-economic framework to minimize the total lifecycle cost (LCC) of an OSS by determining the optimal number of OSSs and transformers considering wind farm capacity and transmission distance. The methodology incorporates three cost models: capital expenditure (CAPEX), operational expenditure (OPEX), and expected energy not supplied (EENS). CAPEX considers transformer costs, topside structural mass effects, and nonlinear installation costs. OPEX accounts for substation maintenance and vessel operating expenses, and EENS is calculated using transformer failure probability models and redundancy configurations. The optimization is performed through scenario-based simulations and a net present value (NPV)-based comparative analysis to determine the cost-effective configurations. The quantitative analysis demonstrates that for small- to medium-scale wind farms (500–1000 MW), configurations using 1–2 substations and 3–4 transformers achieve minimal LCC regardless of the transmission distance. In contrast, large-scale wind farms (≥1500 MW) require additional substations to mitigate transmission losses and disruption risks, particularly over long distances. These results demonstrate that OSS design should holistically balance initial investment costs, operational reliability, and supply security, providing practical insights for cost-effective planning of next-generation offshore wind projects.
Source: Energies
Language: English
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W4411215888
FWCI: 0.388
Cites: 12
Cited by: 1
Related to: 10