Evaluation of Energy Consumption for Mineral Processing of Tungsten Ore in Mongolia: Khovd Aimag and Erdene-Soum as Case Studies
Year: 2025
Type: article
Abstract: The tungsten deposits in Mongolia have the potential to be exploited as an alternative source to alleviate the risk due to the monopolization in the global production of such a critical metal. However, it is challenging to develop an efficient mineral processing method that can complement the supply based on the currently available energy resources in Mongolia. Therefore, the present study investigated the range of energy required for the beneficiation of tungsten ores, including theoretical assumptions and practical evaluation for two processes in Mongolia. The range of energy consumption was 0.12 to 2.21 kWh/t for crushing and 0.29 to 4.62 kWh/t for grinding regarding the range of Kick’s constant 0.2–0.6 kWh/t and Bond work index 7–17 kWh/t, respectively. The most dominant impact factor in the comminution was the product size. The evaluation of 18 different comminution–flotation circuits indicated a range of required energy from 362 kWh to 8298 kWh. The maximum values of energy consumption for mineral processing of Erdene-soum and Khovd Aimag tungsten ore were 6280 and 6355 kWh. An estimation regarding the energy demand (6355 kWh) and supply energy for the process of Khovd Aimag ore was conducted to propose a suitable system of renewable energy resources using the power pinch analysis method.
Source: Minerals
DOI: 10.3390/min15060660
Authors: Ha Bich Trinh, Seunghyun Kim, Taehun Son, Junkun Song, Jaeryeong Lee
Institution: Kangwon National University
Language: English
Subfield: Mechanical Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,896
Award: G1855708856
OpenAlex ID: W4411456625
