A Case Study on Integrating Lean, TPM, and RCM to Improve Equipment Availability in Peruvian Metalworking SMEs
Year: 2025
Type: conference-paper
Language: English
Subfield: Safety, Risk, Reliability and Quality
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W4412162097
