Analisis Perbandingan Waktu Dalam Estimasi Biaya Pekerjaan Struktur Proyek Gedung Presisi 5 Polri: Metode Konvensional Vs Bim 5d
Year: 2025
Type: article
Abstract: This study compares the cost estimation time for structural work between conventional methods and 5D BIM for the Precision 5 National Police Building Project. Using a quantitative approach and case study, data was obtained from project documentation and simulations. The results show that 5D BIM significantly accelerated the estimation process without compromising accuracy.
Source: SINERGI Jurnal Riset Ilmiah
Institution: Universitas Mpu Tantular
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond