Work

Risk Analysis of Pile Pitching and Pulling on Offshore Wind Power Jack-Up Platforms Based on a Fault Tree and Fuzzy Bayesian Network

Year: 2025
Type: article
Abstract: Safety accidents during pile pitching and pulling operations on offshore wind power jack-up platforms occur frequently, yet research into their underlying causes is insufficient. This study delved into the causes of accidents related to pile pitching and pulling and put forward corresponding risk prevention and control measures by integrating the Fault Tree Analysis (FTA) and Fuzzy Bayesian Network (FBN) in consideration of the high-risk characteristics of these operations. Firstly, this study expounded the causal relationship of risk factors in the pile pitching and pulling operations on offshore wind power jack-up platforms via FTA. Secondly, the events in the FTA model were mapped to the FBN nodes. The prior probabilities of each node were determined through expert evaluation, and a Fuzzy Bayesian Network model was constructed. Finally, risk diagnosis and prediction were carried out through probability updating and a sensitivity analysis. The results indicate that environmental risks, including water depth, strong winds, heavy waves, and unknown subsea geology, exert the most significant influence. Equipment malfunctions and management problems are the key causes of accidents. A sensitivity analysis reveals that failures in the pile driving system and underwater monitoring system are highly sensitive triggers for the top-level event. Improvement measures are proposed to mitigate risks and enhance project safety.
Source: Energies
Language: English
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W4414335227
FWCI: 0.616
Cites: 40
Cited by: 1
Related to: