Solar Power System Installation and Power Quality Analysis at Pesantren Hubbul Khoir Indonesia
Year: 2025
Type: article
Abstract: Electricity is very crucial in human life today. Electricity is used in communication, education, offices, household appliances, and transportation. Unfortunately, most of the electricity in Indonesia is still generated by fossil fuels such as coal. There needs to be a transition to renewable electrical energy generation so that electricity can be produced continuously. One option is solar power generation. Solar panels use radiation from the sun to generate electricity. Indonesia, which is located on the equator, has an advantage in solar power generation. Every region in Indonesia gets sunlight for a full year. This paper describes the analysis of the 1.62 kWp solar power generation system installed at Hubbul Khoir Islamic Boarding School. The analysis includes economic analysis, power quality analysis, and power quality analysis from an economic point of view. The results obtained by the PLTS system will return capital in 6.8 years and can get Rp20,871,282.00 after 25 years, the power quality of the PLTS system is good, and the power quality can affect from an economic point of view.
Institution: Sebelas Maret University
Language: English
Field: Energy
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4414338389
