Year: 2025
Type: article
Abstract: Slurry pipeline transportation of iron ore is recognized as a reliable and cost-effective method for long-distance mineral transport. Understanding the associated energy costs is crucial for predicting energy demand and optimizing operational control. This study analyzes the energy consumption of Samarco S.A.’s slurry pipeline 2 over a 16-month period (January 2021 to April 2022), covering 473 operational days. A direct relationship was established between the dry metric tons (dmt) pumped and the total energy consumed (kWh) by the pumping stations. The results indicate an average consumption of 3.9 kWh per dmt, corresponding to an energy cost of R$ 2.27 per dmt, considering the average Brazilian electricity tariff. These findings provide a basis for more accurate energy demand planning and highlight scenarios where deviations in consumption may signal operational inefficiencies or equipment issues.
Authors: Igor Moreira de Carvalho, Edna Maria de Faria Viana, Carlos Barreira Martinez
Language: English
Subfield: Control and Systems Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: diamond
OpenAlex ID: W4414447077
FWCI:
Cites:
Cited by:
Related to:
