Minimizing the weighted number of tardy jobs: data-driven heuristic for single-machine scheduling
Year: 2025
Type: article
Abstract: Existing research on single-machine scheduling is largely focused on exact algorithms, which perform well on typical instances but can significantly deteriorate on certain regions of the problem space. In contrast, data-driven approaches provide strong and scalable performance when tailored to the structure of specific datasets. Leveraging this idea, we focus on a single-machine scheduling problem where each job is defined by its weight, duration, due date, and deadline, aiming to minimize the total weight of tardy jobs. We introduce a novel data-driven scheduling heuristic that combines machine learning with problem-specific characteristics, ensuring feasible solutions, which is a common challenge for ML-based algorithms. Experimental results demonstrate that our approach significantly outperforms the state-of-the-art in terms of optimality gap, number of optimal solutions, and adaptability across varied data scenarios, highlighting its flexibility for practical applications. In addition, we conduct a systematic exploration of ML models, addressing a common gap in similar studies by offering a detailed model selection process and demonstrating why the chosen model is the best fit.
Source: Computers & Operations Research
Institution: Czech Technical University in Prague
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: hybrid
Estimated APC paid: $3,570
OpenAlex ID: W4414975313
