Research on the Optimization of the Volume Fracturing Shut-in and Drainage System of Unconventional Reservoirs in the Erlian Block
Year: 2025
Type: article
Abstract: Aiming at unclear imbibition replacement mechanisms and flowback/production strategies in unconventional reservoirs of the Erlian Block, this study proposes a systematic approach integrating “imbibition-flowback-productivity synergy” to optimize post-fracturing shut-in and production regimes. By developing numerical models incorporating geological and engineering factors, we analyzed fluid dynamics during both the shut-in and production phases. Concurrently, crude oil displacement-fracturing fluid imbibition replacement experiments were conducted to guide parameter optimization. The results indicate that optimized shut-in time and production rates substantially increase recovery efficiency while mitigating reservoir damage and proppant flowback. The well shut-in time of the Erlian Block can achieve the optimal shut-in replacement effect in about 20–25 days. The optimized flowback rate of the unconventional reservoir in the Erlian Block is 25–30 m3/d. The findings offer theoretical insights and practical recommendations for the efficient development of unconventional resources.
Source: Processes
DOI: 10.3390/pr13103258
Language: English
Subfield: Mechanical Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: gold
Estimated APC paid: $2,896
OpenAlex ID: W4415169369
