Work

Rigless Advancements: Enhancing Electric Submersible Pump Reliability Through Cable Deployment

Year: 2025
Type: article
Abstract: Electric Submersible Pumps (ESPs) are widely deployed in high-flowrate wells but are constrained by frequent failures and the need for rig-based interventions. This study presents the development and field validation of a rigless cable-deployed ESP (CDESP) system designed to enhance operational uptime and reduce intervention costs. The system features a corrosion-resistant metal-jacketed power cable, an inverted ESP configuration that eliminates the motor lead extension (MLE), and a vertical cable hanger spool (VCHS) for surface integration without removing the production tree. A field trial in a high-H2S well demonstrated successful rigless deployment using coiled tubing (CT), achieving over two years of continuous runtime. Post-retrieval inspection revealed minimal wear, validating the system’s mechanical durability and reusability. Operational performance demonstrated reduced non-productive time (NPT), enhanced safety, and cost savings, with deployment completed in under 24 h, compared to the typical 10–14 days for rig-based methods. The CDESP system’s compatibility with digital monitoring and its potential for redeployment across wells positions it as a transformative solution for offshore and mature field operations. These findings support the broader adoption of CDESP as a scalable, efficient, and safer alternative to conventional ESP systems.
Source: Energies
Language: English
Open Access status: gold
Estimated APC paid: $3,137
OpenAlex ID: W4416130428
FWCI: 0.406
Cites: 15
Cited by: 1
Related to: