Work

Seismic Optimization Method of Nuclear Power Crane Structure

Year: 2025
Type: article
Abstract: To address the neglect of seismic performance in conventional double-girder bridge crane optimization, this paper introduces a time-history analysis-based seismic optimization methodology for crane structures. Using a 25-t nu... | Find, read and cite all the research you need on Tech Science Press
Language: English
Open Access status: diamond
OpenAlex ID: W4416903976
FWCI:
Cites:
Cited by:
Related to: