MILP-Based Multistage Co-Planning of Generation–Network–Storage in Rural Distribution Systems

Year: 2025
Type: article
Abstract: A multistage coordinated expansion-planning framework for distribution systems is developed to jointly optimize investments in the network, distributed generation (DG), and energy storage systems (ESS). Network reinforcements select from multiple feeder and transformer candidates, while DG installations consider conventional and photovoltaic (PV) options. In this study, a set of candidate buses are considered for the installation of PVs and energy storage systems. Therefore, the expansion plan can determine the optimal installation locations and timing of these candidate assets. The objective minimizes total cost in net-present-value terms, covering investment, maintenance, generation, and operating components. Representative hourly load profiles are incorporated to capture ESS dispatch behavior and PV output variability; operating costs are modeled via piecewise linearization. To preserve connectivity and preclude islanding in the presence of DG and ESS, modified radiality constraints are imposed. The formulation is a mixed-integer linear program solvable efficiently by commercial optimizers, and numerical studies confirm the method’s effectiveness.
Source: Processes
Language: English
Open Access status: gold
Estimated APC paid: $2,896
OpenAlex ID: W4416945502
FWCI: 0.231
Cites: 26
Cited by: 1
Related to: