Work

Increasing the Effectiveness of the Bloomery Smelting Process by Using a Mobile Furnace Shaft—A New Furnace Type for the Early Roman Period in the Barbaricum?

Year: 2025
Type: article
Abstract: This article deals with the experimental validation of an interpretation on the notable archaeological evidence patterns of early historical iron smelting in northern Central Europe. In this region, the inner Barbaricum, there was minimal evidence of iron smelting at the onset of the Roman Period. This shifts suddenly in the initial half of the first century AD: Numerous “centres of iron smelting” are identifiable in this region throughout this period. Numerous discoveries of iron smelting, known as “bloomery smelting furnaces”, are conspicuously clustered. It was formerly believed that the shafts of bloomery furnaces needed to be dismantled post-smelting to retrieve the produced iron. At the site “Sehnde 9” in Lower Saxony, Germany, it has been experimentally verified on several experimental furnace runs that the shafts can be reused, and these experimental results are consistent with the archaeological evidence from the site in question. The comparison with other Central European sites from the same period further substantiates that a reuse of bloomery furnace shafts was not an isolated phenomenon. This strategy markedly enhances the efficiency of iron production over time. Consequently, the designation of a novel furnace type “Sehnde” is suggested.
Source: Heritage
Language: English
Subfield: Archeology
Open Access status: gold
Estimated APC paid: $1,930
OpenAlex ID: W4417041585
FWCI: 6.222
Cites: 8
Cited by: 2
Related to: