Work

Dynamic simulation of a liquefied hydrogen export terminal

Year: 2025
Type: article
Abstract: At prospective liquid hydrogen (LH 2 ) export terminals, managing boil-off gas (BOG) presents a significant challenge that has not been adequately explored in the literature. This work is a case study examining the management of BOG evolved during storage and carrier loading at an export terminal, carried out using detailed dynamic simulations. The considered terminal operates with a LH 2 production rate of 450 t/d, and a carrier capacity of 160000 m 3 . The normal operation cycle spans a period of 28 days, during which all the generated BOG is recovered. The estimated levelized cost for terminal storage and shipment is 2.77 USD/kg, underlining the need for further research to reduce costs and enhance the economic viability of LH 2 export. A sensitivity analysis indicates that the production rate primarily affects the duration of the normal operation cycle and, consequently, shipping frequency, while feed pressure and ortho-para hydrogen composition significantly influence total BOG generation.
Source: Energy
Language: English
Open Access status: hybrid
Estimated APC paid: $4,260
OpenAlex ID: W4417419355
FWCI: 1.199
Cites: 27
Cited by: 3
Related to: