Year: 1994
Type: article
Abstract: The PS controls system is being upgraded since March 1992.Four out of the nine machines of the PS Complex are already operated through the new workstation and VME crates environment.The operation interface presented at ICALEPS in October 1993 is the result of a collaboration between the Controls group and the Operations group.It was designed in order to bring to the operator a uniform environment integrating parameter controls, beam measurements, alarms and general information.The pulseto-pulse modulation of the controls which needed to handle sequentially different types of beams has been redesigned.This paper describes the main lines behind the lay-out of the operation tools.Comparisons are drawn between the current and the new systems from the practical point of view of the user; errors and successes are mentioned, as well.
Authors: J. Boillot, B. Frammery, E. Wildner
Language: English
Subfield: Nuclear and High Energy Physics
Field: Physics and Astronomy
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W53561595
