The Study and Practical Application of Sustainable and Energy Efficient Design and Technology for HVAC and Centralised Solar Hot Water Systems in the Al Zeina Development, Abu Dhabi, United Arab Emirates
Year: 2013
Type: dissertation
Abstract: The Al Raha Beach Development entail a major new city situated at Al Raha Beach on the outskirts of Abu Dhabi-United Arab Emirates. The Development is currently in the early stages of construction and will involve the creation of a new landmass to accommodate the development of several precincts along a canal frontage with an integrated mix of uses including residential, commercial, retail, tourism, recreation and public spaces. The aim is to create a land area for hotels, resorts, shopping arcades, waterside promenades, apartments and offices to ultimately develop a new waterfront city. This 11km long complex has an area of 6,800,000m2, a total built up area of 12,000,000m2 and comprises 9 subdevelopments, including the highly prestigious Al Zeina development. The Al Zeina precinct is considered as 'the strategic gateway to Al Raha' and was constructed at a cost of $510M in 127,190 m2 of land. It provides 1,200 premium Apartments, Townhouses and Villas facing the golden beaches of Abu Dhabi.A large range of facilities within the development, such as swimming pools, private gardens, retail facilities, gymnasiums and libraries are also provided for residents. Pell Frischmann was appointed to provide a full multidisciplinary design service including: architecture, structural engineering, geotechnical and M&E engineering design, fire, vertical transportation, traffic and transportation, construction supervision and the authority approvals. The developer, a joint venture between ALDAR and Laing O'Rourke, appointed Pell Frischmann to design the entire complex based on a previous concept. At the time Pell Frischmann was commissioned, there were no standards or regulations relating to sustainability in place in the UAE.As a consequence, the developer, in recognition of global concerns, specified that it needed to achieve a minimum Leadership in Environmental and Energy Design (LEED) "Silver" rating. Achieving this rating would require design and construction techniques that were very different to the traditional methods of constructing buildings in the UAE.The Al Zeina scheme was procured as a fast-track project with a demanding programme. This was to ensure the scheme would tie in with ALDAR's Yas Island leisure development. The short programme that was specified meant that design and construction had to go hand-in-hand. The strict program, the client's sustainable aspirations, and the lack of standard regulations in the UAE led to the key challenges on this projectwhere the conflicting requirements of our client and the authorities led to considerable design changes. Pell Frischmann acted as arbiter during these discussions to achieve a solution that pleased both the client and the authorities. However, further challenges occurred with the collapse of the global economy, where Abu Dhabi was particularly badly affected, and how we worked with our client through these new and unforeseen pressures. From April 2008 to present, I have been working for Pell Frischmann Consultants, as a senior Mechanical Engineer in building services. Pell Frischmann is a UK based consultant with major operations throughout Europe, the Middle East and Asia.
Source: DiVA (University of Gävle)
Author: Farshid Salehi
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W560194830