Year: 1981
Type: article
Abstract: During the latter half of 1980 the Fermi Lab test program switched from stand alone refrigerator tests to a "Mini" system test, which now consists of two compressor buildings with 4 - two stage units each (final configuration is six buildings), five refrigerators (final is 24 refrigerators), and the Central He Liquifier (CHL). Each of the refrigerators cools two 125 M long strings of magnets.
Institution: Fermi National Accelerator Laboratory
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W56313681
