Year: 2013
Type: dissertation
Abstract: The purpose of this thesis is to describe the preconditions needed to achieve a pull-based value stream in white-collar settings by contrasting this type of work to blue-collar settings.Existing systems for pull-based control in blue-collar settings are evaluated to assess their suitability and whether elements may be combined to increase general suitability in white-collar settings.Data was collected through studying literature and a case study was used to anchor and exemplify the findings.Interviewees comprised experts within the field and staff at Volvo Cars Customer Service as well as staff within the quality bulletin (QB) process, the company and crossdepartmental sample process studied in the case.There are three basic preconditions of pull: defined agreements, dedicated items and control.These preconditions set the stage for what needs to be present and improved.The critical principles that enable these preconditions are: leveling of the workload, standardization, and visual control.Conventional pull systems studied are: Kanban, CONWIP, Kanban-CONWIP Hybrid and POLCA.There have been successful attempts of using pull systems in white-collar settings with repetitive output.The most prominent discrepancies from white-to blue-collar settings are usually higher variability and task discretion, and thus higher complexity.According to some authors, "pure" pull systems are not even feasible when complexity is high.Others are of the belief that this complexity is due to the lack of standardization.Nevertheless, it is important to relax the assumption of order, in other words, to accept that some things have a certain amount of complexity.A "pure" pull system, where parts are pulled from downstream demand and replenished upstream, is not possible in the QB process where output is non-repetitive.This is not an effect from non-physical flow, but from the unpredictability in output and demand.Since work arise from quality issues in the market, pre-defined solutions cannot be stored downstream in advance.The dynamic is similar to Engineered to Order processes where a degree of push and central planning is needed.To keep the process under pull-based control, work units of capacity should be pulled instead of products.Furthermore, depending on the complexity in terms of task-routing in white-collar settings, a pull system can have different levels of control and resource layout to allow for higher flexibility.Standardization is the most important effort in reducing the variability and complexity to allow for detailed control.Thus, by choosing pull system sensibly and/or by making appropriate changes to specific white-collar contexts, conventional pull systems can be as suitable for white-collar settings as for blue-collar settings.The early stages of the QB process have higher variability and lower predictability than the later stages.A POLCA system is more suitable for the early stages, while a Kanban-CONWIP Hybrid system is more suitable for the later ones.
Authors: Jonny Eriksson, Johan Sandström
Institution: Chalmers University of Technology
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: Chalmers Tekniska Högskola
OpenAlex ID: W564877270