Work

Enhancing Visual Unit Bath Setup Implementation Using Bim Approach

Year: 2013
Type: conference-paper
Abstract: A unit bath (UB) is that a bathroom is produced as a unit object in the factory, liking the precast object.Usually, the activity of the UB setup/install is implemented based on 2D CAD documents, while some problems occurred in such situation such as complex information description in one drawing and participants have different experience relating the understanding of 2D CAD drawing.In order to improve the process and performance of the UB setup/install activity, the Building Information Modeling (BIM) technology is applied in this paper.BIM is the process and emphasizes the information delivery in whole construction lifecycle.Utilizing advantages of BIM, the process of the UB install/setup activity is clear than before; and, engineers can have good understanding about the process of the UB install/setup activity through 3D BIM during the construction.Therefore, the BIM-based UB install/setup procedure is proposed in this paper.The proposed procedure is then applied in selected case in Taiwan.The results indicate that the proposed BIM methodology can be an effective tool for UB setup/install implementation.
Language: English
Open Access status: green
OpenAlex ID: W57548076
FWCI:
Cites:
Cited by:
Related to: 10