Year: 2013
Type: article
Abstract: The purpose of this report is to document the research activi ties performed under project SPR - RAC - 727 for the State of Vermont, Agency of Transportation, Materials & Research Section entitled “Optimization of Snow Removal in Vermont” . The overall objective for this project was to develop, for VTrans roadway snow an d ice control operations, storm - specific routes designed to maximize the efficiency of the service provided in terms of labor - hours and fuel . This report describes the set of processes implemented for optimizing RSIC operations for the roadways that VTran s is responsible for . Three different approaches to establishing priority for certain roadways are implemented, including one that uses the Network Robustness Index developed previously by researchers at the UVM TRC, and each is run for three storm levels – low - salt, medium - salt, and high - salt . Storm - intensity levels are important because they dictate the amount of salt application required - – 200 lbs/mile, 500 lbs/mile, and 800 lbs/mile, which is the primary constraint for the maximum length of a round - trip route for roadway snow and ice control. The first task was to optimize the service areas for each of the 61 VTrans maintenance garages based on the travel time between each garage and the surrounding road network . The second task was to develop alte rnative vehicle allocation methods and assign each of the vehicles in the VTrans RSIC fleet to the maintenance garages based on these methods . The third task was to optimally route each of these vehicle allocations according to the combined service time/f uel consumption metric . The fourth and final task was to evaluate the competing vehicle allocations based on the speed with which high priority road corridors are serviced
Source: ROSA P
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: Vermont Agency of Transportation
OpenAlex ID: W575806324