Product Design for Colombia’s Regulated Market
Year: 2007
Type: article
Abstract: The energy-share product enables load to be fully covered with a single product.For a supplier, the load-following product is natural, since in aggregate suppliers must follow load.A supplier is able to manage its exposure to the spot energy price through its portfolio of resources and its portfolio of nonregulated energy contracts.Even for a small supplier without a portfolio of resources or energy contracts, the risk from spot-price exposure is modest.The proposed product does an excellent job of rate stability.Regulated load is fully hedged from the spot price.This makes sense for customers without hourly meters and demand management systems.However, for large nonregulated customers hourly meters should be required and demand response should be encouraged.The proposal can accommodate participation of such customers by introducing additional products that are based on expected load, rather than actual load.The actual load contract (pay as demand) is based on the customer's actual load in each and every hour of the commitment period.In contrast, the expected load contract is based on the customer's expected load in each and every hour of the commitment period as estimated from its historical load shape and estimated growth over the period.The expected-load contract hedges price risk, yet still exposes the customer to the spot price on the margin, motivating demand response.Thus, the proposal can be extended to handle nonregulated demand, and in the future, regulated customers capable of demand response.There are a number of possible choices for the timing and frequency of auctions, and the duration of contracts.These three elements can be adjusted to manage price and credit risk, while minimizing transaction costs.I present several alternatives.I recommend quarterly auctions of 2year contracts, which are rolling on an annual basis.The use of 2-year contracts is consistent with the most common contract in the bilateral market.More importantly, the approach is simple and yet provides broad time diversification, shielding customers from transient events.Oneeighth of regulated load is purchased in each auction.At any one time, two products are active and the customer rate reflects the average of eight auctions equally spaced over a two-year period.Even the auction with the shortest planning period occurs five months before the start of the contract.This means that the auction price will be set before there is much resolution of how severe conditions will be in the following dry season.I believe that this structure strikes the right balance between risk reduction and guarantee cost.The proposed product complements the other key elements of the Colombian market: the spot energy market and the firm energy market.Combined, MOR and the firm energy market fully cover load.Not only does this reduce risk for both sides of the market, it puts suppliers in a nearly balanced position in the spot energy market.As a result, incentives to exercise market power are greatly mitigated in the spot market.My next paper will propose an auction design.Once the auction design is specified, I will be in a better position to evaluate the essential objective of efficient price formation.
Author: Peter Cramton
Language: English
Subfield: Electrical and Electronic Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
OpenAlex ID: W604699461