2A2 SCHEDULING METHOD IN REAL-VIRTUAL FUSION MANUFACTURING SYSTEM WITH SOCIAL CONTRACT BASED APPROACH : APPLICATION OF COMBINATORIAL AUCTION AT OPERATIONAL PHASE(Technical session 2A: OS1: Practical scheduling approach(2))
Year: 2011
Type: conference-paper
Language: English
Subfield: Industrial and Manufacturing Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W611098518
