Application of the cost optimal methodology to two European case studies: an Italian and a Turkish retrofitted existing office buildings
Year: 2014
Type: article
Language: English
Subfield: Building and Construction
Field: Engineering
Domain: Physical Sciences
Open Access status: closed
OpenAlex ID: W615667934
