Work

Waste handling and packaging plant project description

Year: 1991
Type: article
Abstract: ORNL currently has about 300 m{sup 3} of remote handled transuranic (RHTRU) solid waste retrievably stored in trenches and a bunker. This material will be processed through the Waste Handling and Packaging Plant (WHDP) for shipment to the Waste Isolation Pilot Plant (WIPP). Details of siting, construction, and conceptual flow of RHTRU waste through the plant are provided. ORNL also has liquid waste and sludge stored in the Melton Valley Storage Tanks (MVST). The sludge also contains TRU waste, and the WHPP will process an expected volume of 500,000 gallons of a suernatant/sludge slurry for shipment to the WIPP. Specific systems which require more development include the cask transfer system, the linear accelerator-based nondestructive assay and nondestructive evaluation equipment. (MHB)
Authors: Turner, D. W., Moore, J. W., Conatser, D. A.
Language: English
Open Access status: green
Award: G361195141
OpenAlex ID: W63528716
FWCI:
Cites:
Cited by:
Related to: 10