Validation of the Maximum Allowable Amounts of Recycled Binder, RAP, and RAS Using Accelerated Pavement Testing—Interim Report

Year: 2014
Type: article
Abstract: This report summarizes the work conducted on Project 0-6682 up to August 31, 2013. The report is organized in five chapters corresponding to separate tasks in the project work plan, as follows:  Chapter 1 presents the summary of the findings from the literature review.  Chapter 2 presents the plan for the accelerated pavement testing.  Chapter 3 reports on the establishment of the accelerated pavement testing facility.  Chapter 4 presents the results of the laboratory testing conducted to design the mixes.  Chapter 5 presents the construction of the hot mix asphalt layers and provides results of the in-situ tests done during construction.