Work

Towards cost-conscious management of engineering track access

Year: 2011
Type: dissertation
Abstract: Railways operate under the conflicting desired outcomes of minimizing the infrastructure costs while continuing to provide sufficient services.In recent years in Sweden increased rail traffic and reduction of track kilometers have raised traffic densities and reduced track access time for maintenance and renewal (M&R) work, while the safety requirements for maintenance work increase.The demands on quality and capacity have increased in the railway sector, leading to more trains and higher travelling speeds with higher axle loads.Heavier, wider, and longer trains running on the railway results in higher degradation of railway assets and consequently higher maintenance need and cost.Long time functional life span is one of the important aspects of railway infrastructure which is highly dependent on the maintenance and renewal strategy used during its life cycle.The Swedish Traffic Administration is fully outsourcing M&R to maintenance contractors under the public procurement law.In outsourcing maintenance, the contractual relationship between the client and supplier is of great significance.The general objective of the study is to provide a basis for ongoing collaboration between client and supplier towards a costeffective M&R strategy.Specifying track access time in a contract has shown to be a difficult task due to the complexity of the railway system.Nevertheless, contractors need input in the tendering phase to give a realistic price and coordinate resources for their services in advance.A high level of information uncertainty related to track access in the tendering phase and project phase may result in serious implications for the maintenance contractor and potential problems for future railway conditions.The research study highlights various key issues to consider when managing track access conditions for railway maintenance, from the time of procurement to the time of project execution.By analyzing engineering track access for 2010 it is concluded that few possessions between 4-9 hours are reserved in the long-term plan.It results in difficulties for service suppliers to estimate costs of maintenance.The study provides concepts to be used for infrastructure managers and railway contractors to simplify and understand the railway system and how track access uncertainty influence the contractor organization.
Language: English
Subfield: Transportation
Open Access status: green
OpenAlex ID: W650691114
Cites: 29
Cited by:
Related to: 10