Work

Methodology for a DSS to support long-term Flood Risk Management Planning

Year: 2009
Type: report
Abstract: This report is Deliverable 18-2 which describes the conceptual, methodological and technological frameworks and how these are implemented for three pilot sites - the Thames, Schelde and Elbe - through prototype decision or ‘discussion’ support tools. The report describes the generic interactions between all relevant factors that drive and influence flood risk management in the long term and how these may be enacted within the three prototype DSS tools.
Language: English
Open Access status: green
OpenAlex ID: W650746843
Cites: 49
Cited by: 15
Related to: 10