Work

River level sampling periods. A report to the Water Resources Board.

Year: 1971
Type: report
Abstract: The loss in accuracy of stream flow measurement caused by a reduction in the stream l e v e l sampling frequency has been calculated f o r a sample of British catchments. An attempt has been made to describe the necessary sampling frequency for a given error level in terms of e a s i l y measureable catchment characteristics. Equations for predicting the necessary sampling frequency for o t h e r catchments are given, together w i t h a s t a t i s t i c a l description of their reliability.1.
Authors: P. W. Herbertson, J. R. Douglas, Alison M. Hill
Language: English
Open Access status: green
OpenAlex ID: W68814465
Cites:
Cited by: 1
Related to: 10