Work

Experience in implementing the algorithm for emergency control system of unloading in case of overload in terms of power based on synchrophasor angle

Year: 2024
Type: article
Abstract: \nAn algorithm for automatic unloading during a power overload is described. It is based on measurement of the phase angle between voltages on the Tyumen - Ural power transmission line, which is determined by information from phasor measurement units. The algorithm is implemented in a specialized controller K-100.\n
Language: English
Open Access status: green
OpenAlex ID: W6884559701
FWCI:
Cites:
Cited by:
Related to: