Project Success Factors and Their Effects, on Public Construction Projects, the Case of Ilu-aba-boor Zone, Mattu Town Construction Projects.
Year: 2025
Type: article
Abstract: Construction industry is known for its: fragmentation problems, low productivity, delay and cost overruns; poor safety, and insufficient quality which ultimately leads to project success factors and effects. The purpose of this study is toward aiming to find out the problems interms of Project Success Factors and their Effects that leads to construction project failure, assessing the significant effects of project success factors and evaluating the top most effective measures with recommended and remedial solutions that cause project success factors and effects of public construction projects. This research implies: theoretical, descriptive, cause –and –effect, with: questionnaire distribution, interview, observation and document review were the methods of data collection used in this study. Relative importance index method was used and the results were presented by: tables, charts and figures. Convenience or availability of non-probability sampling technique of data collection was used. As the study goes to deep specifically, the first most top causative players of project success factors were: i.e. material wastage on projects and Price escalation of construction materials, lack of an effective and efficient procurement planning, enterprise does not identify its stakeholders properly and evaluate the stakeholder acceptability, lack of supervision and delay of inspections and unexpected changes in material availability. Through these, the causative success factors were toward effect related to: cost overrun, delay and quality problems such as: cost incurred due to high wastage, poor planning and scheduling, lack of an effective project quality planning. The end results from these effects were project failure and termination. Correlation analysis implies that if the: resource, procurement, stakeholder, site supervision and external factors are improved; it would improve projects quality failure. Hence, it has recommended that: having a clear and brief plan that the contractors, consultants and clients toward intended relating to the objectives oriented of construction projects. Further study has going to be needed and futurity is better toward improving and controlling project success factors over: time, cost and quality of all parties to ensure the highest quality of construction projects and find out whether there is project success factors and effects, periodically within project implementation.
DOI: 10.20372/nadre:16172
Author: Jibril Mohammed
Institution: Mattu University
Language: English
Field: Decision Sciences
Domain: Social Sciences
Open Access status: green
OpenAlex ID: W6944708374
FWCI:
Cites:
Cited by:
Related to: