Year: 2024
Type: article
Abstract: The action agency for this consultation is the United States Army Corps of Engineers (USACE), San Francisco District. On October 22, 2024, the Interagency Cooperation Division finalized its section 7 biological opinion and determined that the proposed Vineyard Valley Mobile Home Park Bank Stabilization Project is not likely to jeopardize the continued existence of any ESA-listed or proposed species, or destroy or adversely modify designated or proposed critical habitat. The USACE submitted an amended request for consultation to include additional measures to improve fish passage under a bridge that will be upgraded as part of the project. Consultation in accordance with section 7(a)(2) of the ESA, associated implementing regulations (50 C.F.R. §402), and agency policy and guidance was conducted by the NMFS ESA Interagency Cooperation Division. This biological and conference opinion (opinion) and ITS were prepared by the Interagency Cooperation Division in accordance with section 7(b) of the ESA and implementing regulations at 50 CFR §402. This document represents NMFS’s opinion on the effects of these actions on endangered and threatened species and designated critical habitat for those species.
Source: NOAA Institutional Repository
DOI: 10.25923/ckp4-as12
Institution: NOAA National Marine Fisheries Service
Language: English
Subfield: Nature and Landscape Conservation
Field: Environmental Science
Domain: Physical Sciences
SDG: Life on land
Open Access status: green
OpenAlex ID: W6946375551
FWCI:
Cites:
Cited by:
Related to: