D4.3_Base-cases definitions and KPI calculation for cement, steel, Bio-CHP and WtE plants with and without capture
Year: 2024
Type: article
Abstract: The first part of deliverable D4.3 provides a description of the reference facilities considered in the CaLby2030 project, the methodology and the definition of the various key performance indicators (KPIs) considered for energy, technical and economic comparisons. The integration of the various reference plants with a MEA solvent-based CO2 capture system is then described and analyzed. These plants are considered as benchmarks for comparing the performance of Calcium Looping (CaL) systems, which are analyzed in detail from an energy, technical and economic point of view for the different sectors in the last part of the deliverable.
Author: Laboratorio Energia Ambiente Piacenza (LEAP)
Language: English
Subfield: Biomedical Engineering
Field: Engineering
Domain: Physical Sciences
Open Access status: green
Funder: European Commission
OpenAlex ID: W6949367314
FWCI:
Cites:
Cited by:
Related to:
